SEALANT CAOMPANY LOGO
English
  • English
  • Русский

TENGYU DYNAMIC

Specializing in silicone adhesive and sealant research and development, production, sales in one of the national high-tech enterprises

 

 

 

 

tengyu news center

Construction process of epoxy anchor adhesive

2024-06-24 09:35:50

Click:

Epoxy anchor adhesive is an important engineering material, which is widely used in various projects such as buildings, bridges, tunnels. This article will introduce in detail the construction process of epoxy anchor adhesive in engineering, including preparation work, rebar-anchoring construction, curing and maintenance.

1. Preparation

● Design briefing: Before the construction of epoxy anchor adhesive, it is necessary to conduct a full design briefing to clarify the design intention, engineering requirements, material specifications and other details.

● Site cleaning: Clean the construction site, including dust, oil, impurities, etc., to ensure that the construction surface is clean and tidy.

● Material preparation: Prepare sufficient anchor adhesive and steel bar materials according to the design requirements, and ensure that the material quality meets the requirements.


2. Construction process

● Drilling: According to the design requirements, use drilling equipment to drill holes in the concrete structure to ensure that the hole diameter and hole depth meet the design requirements.

● Hole cleaning: Use tools such as air compressors or high-pressure water guns to remove dust and debris in the hole.

● Steel bar treatment: Rust removal, grinding and other treatments are performed on the steel bars to ensure that the surface of the steel bars is clean and flat.

● Glue preparation: According to the requirements of the epoxy anchor adhesive instructions, mix the epoxy anchor adhesive and curing agent in proportion.

● Rebar planting: Apply the prepared epoxy anchor adhesive evenly on the surface of the rebar, and then insert the rebar into the hole to ensure that the rebar is accurately and vertically positioned.

● Maintenance: After the rebar is planted, the implanted rebar is fixed and maintained, which generally requires more than 24 hours of maintenance.


3. Precautions

● During the construction process, strictly abide by the design requirements and construction specifications to ensure that the construction quality meets the requirements.

● Carry out sufficient cleaning work on the construction site to ensure that the construction surface is clean and tidy.

● Before using the epoxy anchor adhesive, you must fully understand the characteristics and usage of the rebar glue to ensure correct use.

● During the maintenance process, avoid disturbing or impacting the implanted steel bars to avoid affecting the quality of the implanted steel bars.

● After the curing is completed, the quality of the implanted steel bars must be inspected to ensure that the quality of the implanted steel bars meets the requirements.


You May Also Like

 


ADDRESS

 

LOCATION:

Lan Gao Youth Science and Technology Entrepreneurship Park, Longkou City,

Yantai City, Shandong Province, China

Phone No.: 0086-18596167593

WhatsApp: 0086-18596167593

EMAIL:tina@sdsealant.com

 

-CONTACT US-

  • Your Name *

  • Your Email *

  • Phone/WhatsApp Number *

  • Message *

  • Get A Quote

  • Security Code
    Refresh the code
    Cancel
    Confirm
Service Center

Please choose online customer service to communicate

Contacts
Phone No.
86-18596167593
Scan a QR Code
添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了
Get product packaging & quotation
Click to contact us now! ×